Teleperformance | Baltic Place, Gateshead

  • Project Brief

Fresh Workspace were asked to fit-out 3 floors of Teleperformances new Gateshead building. The densely populated floors meant the provision of additional fresh air and cooling to supplement the Landlords supply. A 550kva back-up generator was installed in a bespoke sound proof enclosure within the underground car park. The scheme comprised dedicated Training facilities, meeting rooms, large breakout and canteen space, locker rooms, a sealed comms room and large open plan environments

Specification of Works

Area: 30,000 sq ft

On Site: 12 weeks

Partitioning:
Full height 12mm glass and solid partitioning with sound insulation

Electrical:
4 compartment floor boxes with 2 twin sockets, a TP&N distribution board

Flooring:
Interface carpet tiles and non-slip vinyl to tea point. Heavy duty and static tiles to Comms room floor

Plumbing:
Tea point

Lighting:
Relocation of existing light fittings to suit new layout with feature lighting to boardroom, training and breakout areas

Comms:
Provision of dedicated racks to Main Comms room and Hubs on each floor connected with dedicated fibre backbone. Installation of 60 kva N+1 UPS system and FM200 fire suppression system

Furniture:
Workstations, task chairs and screens for 500+.  Furniture for a variety of meeting rooms, bespoke Training Room furniture, and solutions for a variety of Breakout and café requirements

Power & Data:
Cat6 infrastructure to include cable, modules, patch panels, CMB, matting, sleeving etc.  Fibre back bone from hubs to comms room

Joinery:
Creation of raised management platforms with oak capping

M&E:
Supplementary  fresh air systems & supplementary cooling for call centre, IT Suite, UPS and Comms Room

Miscellaneous:
Installation of a 550 kva back up generator within sound proof enclosure including a  6000 litre double skinned fuel tank